Skip to main content

July 2024 Generation Charges and Bill Rates

 

july_2024_gen_charges

july_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.       
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.       
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015       
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.       
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.       
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.       
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.       
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.       
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

June 2024 Generation Charges and Bill Rates

 

june_2024_gen_charges

june_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.       
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.       
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015       
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.       
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.       
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.       
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.       
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.       
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

May 2024 Generation Charges and Bill Rates

 

may_2024_gen_charges

may_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

April 2024 Generation Charges and Bill Rates

 

april_2024_gen_charges

april_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

March 2024 Generation Charges and Bill Rates

 

mar_2024_gen_charges

mar_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

February 2024 Generation Charges and Bill Rates

 

feb_2024_gen_charges

feb_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

January 2024 Generation Charges and Bill Rates

 

jan_2024_gen_charges

jan_2024_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.         
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.         
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015         
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.         
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.         
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.         
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.         
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.         
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

December 2023 Generation Charges and Bill Rates

 

dec_2023_gen_charges

dec_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.         
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.         
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015         
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.         
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.         
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.         
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.         
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.         
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

November 2023 Generation Charges and Bill Rates

 

nov_2023_gen_charges

nov_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.         
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.         
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015         
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.         
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.         
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.         
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.         
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.         
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

October 2023 Generation Charges and Bill Rates

 

oct_2023_gen_charges

oct_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.        
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.        
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015        
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.        
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.        
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.        
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.        
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.        
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

September 2023 Generation Charges and Bill Rates

 

sept_2023_gen_charges

sept_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

August 2023 Generation Charges and Bill Rates

 

aug_2023_gen_charges

aug_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

July 2023 Generation Charges and Bill Rates

 

july_2023_gen_charges

july_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

June 2023 Generation Charges and Bill Rates

 

jume_2023_gen_charges

june_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

May 2023 Generation Charges and Bill Rates

 

may_2023_gen_charges

may_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

April 2023 Generation Charges and Bill Rates

 

april_2023_gen_charges

april_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

March 2023 Generation Charges and Bill Rates

 

march_2023_gen_charges

march_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

February 2023 Generation Charges and Bill Rates

 

feb_2023_gen_charges

feb_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

January 2023 Generation Charges and Bill Rates

 

jan_2023_gen_charges

jan_2023_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

December 2022 Generation Charges and Bill Rates

 

dec_2022_gen_charges

dec_2022_bill_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

November 2022 Generation Charges and Bill Rates

nov_2022_gen_charges

nov_2022_bill-rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

October 2022 Generation Charges and Bill Rates

oct_2022_gen_charges

oct_2022_monthly_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

September 2022 Generation Charges and Bill Rates

sept_2022_gen_charges

sept_2022_monthly_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

August 2022 Generation Charges and Bill Rates

aug_2022_gen_charges

aug_2022_monthly_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

July 2022 Generation Charges and Bill Rates

july_2022_gen_charges

july_2022_mon_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

June 2022 Generation Charges and Bill Rates

june_2022_gen_charges

june_2022_monthly_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

May 2022 Generation Charges and Bill Rates

may_2022_gen_charges_0

may_2022_monthly_rates_0

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

April 2022 Generation Charges and Bill Rates

april_2022_gen_charges_0

april_2022_monthly_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

March 2022 Generation Charges and Bill Rates

march_2022_gen_charges

march_2022_monthly_rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

February 2022 Generation Charges and Bill Rates

feb_2022_gen_charges

feb_2022_monthly_charges

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

January 2022 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

December 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

November 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

October 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2021-018 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2021-018 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

September 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

August 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

July 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

June 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

May 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

April 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

March 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

February 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

January 2021 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2019-056 RC dated December 29, 2020.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

December 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

November 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

October 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordanc with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

September 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

August 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

July 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

June 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

May 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.      
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

 

April 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019, has been suspended for one month as per ERC Order dated March 17, 2020 in light of COVID-19 situation and the proclamation by the Government of State of National Health Emergency.

 

March 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC1 dated April 10, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019, has been suspended for one month as per ERC Order dated March 17, 2020 in light of COVID-19 situation and the proclamation by the Government of State of National Health Emergency.

 

February 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2015-139 RC1 dated April 10, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.

 

January 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

December 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

November 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

October 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

September 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

August 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

July 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.      
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

June 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
7. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

May 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
7. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

April 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.      
7. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

March 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017      
7. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

February 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017      
7. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

January 2019 Generation Charges and Bill Rates

     
1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
6. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017      
7. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

December 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
    2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
    3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
    4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
    5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
    6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017      
    7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017      
    8. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

November 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
    2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
    3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
    4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
    5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
    6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017      
    7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017      
    8. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

October 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009      
    2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009      
    3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015      
    4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009      
    5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.      
    6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017      
    7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017      
    8. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

September 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

 

August 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

 

July 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

June 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

May 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

April 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

 

March 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

February 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

January 2018 Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

December 2017 Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017