October 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordanc with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

September 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

August 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

July 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

June 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

May 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.
9. In accordance with ERC advisory dated May 22, 2020 UC Environmental Charge is suspended until further notice.

April 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC dated April 10, 2019, cessation of order effective February 2020.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019, has been suspended for one month as per ERC Order dated March 17, 2020 in light of COVID-19 situation and the proclamation by the Government of State of National Health Emergency.

March 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost  in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009, inclusive of adjustment as per ERC Case No. 2017-056 CF.
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009,  inclusive of adjustment as per ERC Case No. 2017-056 CF.
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC1 dated April 10, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019, has been suspended for one month as per ERC Order dated March 17, 2020 in light of COVID-19 situation and the proclamation by the Government of State of National Health Emergency.

February 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2015-139 RC1 dated April 10, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2018-085 RC dated October 28, 2019.

January 2020 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

December 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

November 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

October 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

September 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

August 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

July 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Cases No. 2015-139 RC dated July 4, 2019.
7. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
8. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

June 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
7. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

May 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
7. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

April 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2013-195 RC MR docketed January 15, 2019.
7. In accordance with the Decision in ERC Case No. 2017-079 RC docketed March 12, 2019.

March 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017
7. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

February 2019 Generation Charges and Bill Rates

1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017
7. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

January 2019 Generation Charges and Bill Rates


1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
6. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017
7. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

December 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
    2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
    3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
    4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
    5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
    6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
    7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017
    8. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

November 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
    2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
    3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
    4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
    5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
    6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
    7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017
    8. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

October 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
    2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
    3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
    4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
    5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
    6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
    7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017
    8. In accordance with the Decision in ERC Case No. 2016-192 RC docketed May 11, 2018

September 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

 

August 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

 

July 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

June 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

May 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

April 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

 

March 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

February 2018 Generation Charges and Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

January 2018 Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017

December 2017 Bill Rates

  1. Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 16, Series of 2009
  2. Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 16, Series of 2009
  3. Implementation of provisionally approved PBR rates for Regulatory Year 2015, in accordance with ERC Order on ERC Case No. 2014-130 RC dated February 2, 2015
  4. Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No.16, Series of 2009
  5. In accordance with the ERC Order in Case No. 2014-135 RC dated August 17, 2015 extending its provisional authority allowing NPC to implement the CY 2014 UCME subsidy amounting to PhP0.1544/kWh.
  6. In accordance with the Decision in ERC Cases No. 2013-160 RC and 2014-111 RC docketed July 21, 2017
  7. In accordance with the Decision in ERC Case No. 2013-195 RC docketed July 21, 2017